First result · 2026-09-07 14:47 UTC
consider-now / postpone — did ‘table the proposal’ put it before the meeting, or take it off the agenda?
Not yet counting in evidence decisions. This row remains available for assessment, but does not currently carry a counting evidence result.
- What was measured
- token cost ·
token_delta
How does the wording change tokenizer units for the declared tokenizer population? - Reported result
- -6.375 tokens per declared item
Reported interval: -8.375 to -6.375.Fewer tokens on the named current tokenizers; this is the encoded-length difference, not the proposal decision.
- English comparison
- English comparison not recorded as a structured label
Declared by the submitter; not a certification of equivalent information.
- Tokenizer conditions
- Literal encoding cost on the named current tokenizers; not comprehension.
- Named instruments
cl100k_base,o200k_base,p50k_baseReader population not separately declared.
- Conditions covered
- No condition-by-condition settlement contract recorded
An overall average can hide a weak condition. A condition list is not proof that every form or claim in the proposal was tested.
- Settlement role
- Awaiting independent settlement
An original reports one result. It does not confirm itself.
- Is this result within the cost allowance?
- This headline is within the allowance.
The reported difference is -6.375 tokens; the current declaration allows at most 0 tokens.
This compares Ainglish minus English with the current declaration, which may differ from the declaration when the result was filed. It checks the headline only: inspect any required per-form and per-tokenizer results too.
- Has the original estimate been independently reproduced?
- Awaiting independent settlement.
An original reports one result. It does not confirm itself.
Reproduction asks whether fresh-input findings agree under the settlement rule. It does not ask whether either value satisfies the cost allowance.
Being within the cost allowance is not a completed prerequisite. Reproducing an original estimate is a separate check, not proof that the allowance is met. Current evidence status, settlement and every declared result still determine readiness.
How can one check pass while the other does not?
For example, an allowance of at most +3 tokens and an original estimate of +3 ask different questions. A replication of −0.5 is within that allowance but may disagree with the original. A replication of +3.25 may reproduce +3 within the settlement tolerance while exceeding the allowance.
These are illustrative numbers, not a new settlement rule. A cost saving is not a comprehension result, and a reproduced premium does not by itself mean a proposal should be adopted or rejected.
Inspect actual inputs and recorded answers
The comparison label is the submitter’s declaration, not a semantic certification. Check that both versions preserve the information needed to answer the same question.
Numbers count only readable inputs attached to this receipt. They are not the experiment’s declared sample size or the number of reader calls.
Showing 1–6 of 8 readable, inline study items, in stored order—not a selection of successes. 0 control items are kept separate.
Each result has its own input pages. Positions across the two studies do not imply matched cases.
Input 1
- English input
- Put the safety amendment before this meeting for consideration now; this does not approve it.
- Ainglish input
- Consider-now(the safety amendment).
Input 2
- English input
- Do not take the vendor motion up in this meeting; keep it available for possible later consideration, with no return time guaranteed.
- Ainglish input
- Postpone(the vendor motion).
Input 3
- English input
- Bring the budget revision before the board for immediate consideration.
- Ainglish input
- Consider-now(the budget revision).
Input 4
- English input
- Remove the hiring proposal from this session agenda; keep it available for later.
- Ainglish input
- Postpone(the hiring proposal).
Input 5
- English input
- Put the security patch before the team for review now.
- Ainglish input
- Consider-now(the security patch).
Input 6
- English input
- Take the feature request off the sprint agenda; keep it for possible later consideration.
- Ainglish input
- Postpone(the feature request).
Recorded input digest: 68c228637fc78128538ed606c74cb0394751363bffe10f9b271af0ea46486793
Prompts, reference material and other context can live elsewhere in the specification. Inputs and keys alone do not reconstruct every reader call or establish a fair comparison.
Declared population, method and retained outcomes
- Compared with
- token_delta
- Tested population
- cl100k_base/o200k_base/p50k_base
- Unit tested
- pair
- How results combine
- maximum tokenizer mean
These are the study author’s declarations. A finding applies to this tested scope; this summary does not establish that another study is comparable.
Absolute arm results, reader-specific results and condition results below are retained values, not a newly pooled analysis. Accuracy arms use fractions from 0 to 1; their difference uses percentage points.
Absolute arm results
Not recorded
Reader or tokenizer results
[
{
"model": "cl100k_base",
"value": -8.375
},
{
"model": "o200k_base",
"value": -8.375
},
{
"model": "p50k_base",
"value": -6.375
}
]
Condition results
Not recorded
Exact result and immutable specificationExperiment history
Attempt 434fd1ef-85d4-48a5-954e-282057d1b163
Content 56b60051728a709f7a507e81e433c50a91ad1a9cf38f19f79612efb606e7fd1b