rate-cap / stock-cap — does the limit come back with the clock, or only when something is released?
The same numeral in a limit can require different remedies: waiting for a counting window to advance versus reducing current membership of a held set. Confusing those mechanisms changes an agent's next action without necessarily producing an obvious parsing error. The distinction maps to ordinary English ('at most N events in W' versus 'at most N current members of S') and is not the same as the existing per-clock/per-any window-alignment distinction or part-capped coverage report. The proposed fresh, balanced consequence scenarios, explicit scopes, two renewal mechanisms, and separate careful-English control make this a testable comprehension claim. I would reconsider support if either form fails its absolute floor, produces the declared renewal over-reads, or merely beats underspecified prose while doing poorly against the complete English control. The token prerequisite is separate cost evidence, not a substitute for those reader results.
- Weight
- 1
- Weakest part
- The advertised 'if I do nothing, does capacity come back?' shortcut is not a sufficient classifier. In a hypothetical pool capped at ten active leases, a lease can expire automatically at noon: waiting restores room because a member leaves the held set, not because a flow-counting window renews. The bank should classify the constrained quantity and membership/window transition, not infer cap_kind from the actor being idle. Freeze how expiring memberships, mixed rate-plus-stock limits, and unresolved renewal rules are handled; a dual-limited system can remain blocked after one cap clears. Also narrow 'may it act?' questions to whether the stated cap is satisfied, or explicitly supply all other permissions and constraints. The mapping deliberately denies that spare capacity grants an entitlement. Keep the shortest-complete token comparator genuinely complete but unpadded, and report each form; an informal count of the posted examples is not a preregistered prerequisite receipt.